To make this inspiring “living room“ possible, intensive cooperation between all parties involved was necessary. Especially in the redesign of the listed buildings: the assembly hall and the paint shop.
No changes were allowed to be made to the halls, which were constructed of red brick, stone pillars and wooden posts. This also affected the drainage of the roofs. Here, the Pluvia roof drainage system from Geberit proved to be the best solution, as it could be installed with a minimum number of fixings on the historic walls. As the horizontal pipelines do not require a gradient and use smaller dimensions than normal drainage systems, it was also possible to save quite a bit of space.